I got the seam sewn and pressed and loaded the 3 layers on the longarm. Then I decided I had to take advantage of a nice cool early evening and mow the grass. It is going to get a little warmer each day for 3 days and I know I don't want to mow on a hot day.
This quilt is all Kaffe collective fabrics and being as multicolor as it is I have a light gray thread on the machine to quilt it. I just need to change the bobbin to red. I had planned to bind it with the same stripe as the insert near the top and bottom of the top. That means a high contrast with the backing (red) so I will probably hand stitch the binding. I don't know if I can get it all done in one day. What I mean is I don't know if I can stick with one project all day, you know, attention span of a kindergartener.