Wednesday, October 26, 2022

Finished one..............


I finished the hand sewing of the binding on this on point 16 patch but it was too late to take its full photo.  I'll do that today while there is daylight.  Here you can see the 2 fabrics I used for the setting triangles and corners.

The last 2 strip sets were sewn and then all 6 were pressed and cut into the 2 strips for the blocks.  I'll sew that center seam on them today and try to finalize the arrangement of all 36 blocks.

We had rain starting in the early morning hours yesterday and off and on all day.  There was supposed to be some rain overnight last night so I am waiting for the total amount in my rain gauge this morning.  It wasn't heavy rain most of the time so I don't think we got what they were predicting.

Tuesday, October 25, 2022

Still hand sewing........


I finished hand sewing one short side and all but 15" on the second long side.  So...15" + one short side and I'll be done.





This is 4 more strips sets waiting to be pressed so I can cut the sections for the blocks.  Just 2 more sets of strips to sew.  I hope I can be sewing the top together on Thursday.  Then I need to get the border cut and sewn on the cool version of "the Other 16 Patch".

Monday, October 24, 2022

Binding...for days..........


I chose this Brandon Mably Creased fabric of which I only have one yard for the binding of the 16 patch on point.  The stripe runs crosswise so I had to decide if I would cut the strips crosswise or have shorter strips cut lengthwise.



I laid it next to the edge of the quilt and decided I liked the stripe running the long way (crosswise cut strips).  Since it was an irregular stripe I didn't have to worry about fussy cutting it along the edge of a stripe.



Here is a corner where the stripes actually lined up.  Bonus!  I have one long side hand stitched and it will take a couple days to finish it.



I added the 3 blocks I finished yesterday.  I have the strips cut for the last 6 blocks so I'll alternate sewing them with working on the hand stitching of the binding.


 

Sunday, October 23, 2022

Slowly, so slowly..........


I thought I would have the binding chosen and cut but all I got done was trimming the quilt in preparation for binding.  The backing has an orange background and one setting triangle fabric has an orange background and the other one has a red background.  I'll be trying some candidates today.


There are 3 blocks for "The Other 16 Patch" ready for their last seam and I chose 5 more pairs of reds/oranges to sew.  That leaves one pair of fabrics yet to be chosen for the last block.







The tree straight across the street from my front door is fully turned color now and has dropped a lot of leaves.  It is so pretty in the sunshine.





I have some combination hydrangea blooms for my winter bouquets.









This bouquet is the latest Zinfin Doll hydrangeas I cut for a bouquet.  They have more of a beige cast than the ones in the other bouquet.  The cold nights did that to them.
 
 

Saturday, October 22, 2022

27 out of 36 blocks............


I added 10 more blocks last night to the design wall.  It will be 2 rows longer so the last row will be on the floor.  I  need to make 9 more blocks and I have the fabrics chosen for 3 of them.

I worked on a little outside clean up since it was in the 70s yesterday.  Continuing on the red theme, one of my 3 compact burning bushes is showing more color.




The perennial pinkish red Dianthus is still blooming.







My red shaggy Coneflower which I showed a couple weeks ago when it first started blooming.  It was yellow then, turning orange next and some of the bottom petals are beginning to look red now.  I don't know if the second bud will bloom but we have a lot of warm weather predicted for the 8-14 day forecast.


There are many more petals on this variety than on my native purple Coneflowers in the back garden.






One more red for you, my neighbor's pink-red burning bush and his other tree, not sure what kind it is.
  
 

Friday, October 21, 2022

Quilting day...............


The month is slipping away and I need some finishes.  I got this one quilted yesterday afternoon.  I unpinned it from the leaders but haven't trimmed it yet.




I found a spool of dark pink, orange and yellow variegated thread to quilt it.  






I turned the red blocks to the horizontal position which makes the rectangles vertical.  Confusing, right?  I added the 7 new blocks that I pressed.  I will be using some fabrics twice in this one.



Here is the next batch in progress.  I need to find some more dark reds today as well as more oranges for the light colors.  Three of these are Brandon Mably prints.  He does more that read mostly one color than Philip or Kaffe do.

 

Thursday, October 20, 2022

Lots of red................


I pressed the strip sets from Tuesday and cut the strips for the blocks, then sewed the blocks.  Also I cut more strips and sewed 7 more strip sets which now need pressing before I can proceed.  I need 30 more strips for 15 more blocks to make a 64" x 80" quilt top.  I plan on turning the blocks to a horizontal position for this quilt.

Yesterday was grocery shopping day, 2 stops, so I didn't get around to picking thread for the next finish or cut borders for my last top.

I have given up trying to save the tomato plants.  When I removed the sheets the plants were wilted under them.  I think it got down to 26 degrees here.  I picked a big batch of the largest green tomatoes and hope that maybe the rest that are left on the plants will survive the 31 degrees tonight and ripen as we go into several days of 60s and 70s.  I read last night about ripening the green tomatoes with a banana.  I had to look up how green the banana should be.  It suggested a shoe box with a loose lid and a banana with just a little green left on it.  Put the tomatoes in a single layer not touching each other.  We'll see how many of them will ripen.