Sunday, September 6, 2026

Busy day......................


I started out the day making the backing for the Kaffe Zipper quilt.  I had 4 yards and had to do some creative cutting and sewing to piece the back.  There were 4 seams altogether.  I had one piece 1" x 3.75" left over.

Then I pressed the binding fabric and cut the needed 7 strips.  I got the binding sewn to the back and started the machine topstitching to finish it.  I decided to finish it today instead of pushing ahead while I was tired.

Today is supposed to be 78 degrees.  What a relief that is after all of those 90 degree days with tropical humidity.  The humidity will get down in the comfortable range by afternoon.

No comments: