I got two quilts back from my longarm friend Robin. That means I have 2 bindings to do. The Churn Dash/Hole in the Barn Door top was made in August 2020 so it's time to be finished. The Kaffe red squares quilt top was made in November last year.
I'm always saying the Tiger Lilies bloom around the 4th of July, so right on cue the first few blooms appeared. They are about 5' tall.
I have to thank the bird that brought the first seeds to my front garden, and the lilies mysteriously appeared one spring. I transplanted most of them to the back garden over a period of 3 years.
I still haven't dug out and transplanted the renegade outside my dining room window. In fact there are 2 plants there this year. This whole little garden needs to be dug out and re-done but it will have to wait 'til fall.
It wasn't extremely hot yesterday but it was so humid. I went out around 7 to take pictures and water the tomato plants that are in pots. I also had to tie up a couple of them. I have all of them staked and have been moving the ties up toward the top. I picked 2 more of the 4th of July variety that were half red/half orange.